ElectronIxTrace

Industry

Traceability for pump and valve assembly

A pump that leaks in the field is traced back to one gasket lot or one under-torqued flange. Trace keeps the values that tell you which, per unit.

The situation this is for

Field failures start arriving from one region. The common factor turns out to be a gasket lot that was fine on paper. You need every unit that used it — and just as importantly, proof of which units did not.

What gets captured

A route for this product

Routes are configuration, so this is a starting point rather than a fixed template. Yours is built from your operations at the walkthrough.

  1. 10 · Body identification — mark applied and verified on the casting
  2. 20 · Seat and seal assembly — lots scanned against the BOM
  3. 30 · Flange torque — captured per fastener
  4. 40 · Grease and cover — boolean confirmation recorded
  5. 50 · Hydro test — pressure and hold time captured
  6. 60 · Label and dispatch

Questions from this industry

Half our stations have no instrument. Does that break the record?

No. A manual station captures the same points against the same limits with the same audit fields — only the source flag differs. Plants are never uniformly instrumented, and the manual half is exactly where data normally goes missing.

We assemble in batches, not on a moving line. Does that work?

Yes. A route is a graph of operations, not a conveyor. Batch assembly, cell assembly and line assembly are all just different route shapes and station configurations.

Talk about traceability for pumps and valves

We walk one line, list what each operation should capture, and tell you plainly which of your machines can be read. You get that list whether or not you buy anything.

Not sure a full MES is the right answer? Read how to choose between MES and standalone traceability.